Name & Address of Client Worksite Address Architects Consultants Project Managers Type of Installation Period of Execution
CBRE SOUTH ASIA PVT. LTD., IBM INDIA PVT. LTD., RSP DESIGN CONSULTANTS (INDIA) PVT. LTD., RSP DESIGN CONSULTANTS (INDIA) PVT. LTD., CBRE SOUTH ASIA PVT. LTD., Electrical works comprising  LT Panels,  LT Cables & End Terminations, Conduit / Point Wiring, MCB DBs, Light Fittings, Cable Trays, Raceways, Junction Boxes, Switches & Sockets, Earthing etc.
Hulkul Brigade Centre, Ground Floor, No.82, Lavelle Road,
Bangalore 560 001.
SOD AVANCE, Block-05(h6a), Hitech City, Avance Business Hub, Madhapur, Hyderabad, Telangana
1,00,000 Sq.Ft. Area
No.30, Museum Road,
Bangalore – 560 001
No.30, Museum Road,
Bangalore – 560 001
Hulkul Brigade Centre, Ground Floor, No.82, Lavelle Road, Bangalore 560 001. DECEMBER’ 2016
TO
APRIL’ 2017

 

Name & Address of Client Worksite Address Architects Consultants Project Managers Type of Installation Period of Execution Value of Work in LAKHS (INR)
CBRE SOUTH ASIA PVT. LTD., IBM INDIA PVT. LTD., RSP DESIGN CONSULTANTS (INDIA) PVT. LTD., CBRE SOUTH ASIA PVT. LTD., Electrical works comprising  LT Panels,  LT Cables & End Terminations, Conduit / Point Wiring, MCB DBs, Light Fittings, Cable Trays, Raceways, Junction Boxes, Switches & Sockets, Earthing etc.
Hulkul Brigade Centre, Ground Floor, No.82, Lavelle Road,
Bangalore 560 001.
SOD AVANCE, Block-06A, Hitech City, Avance Business Hub, Madhapur, Hyderabad, Telangana
4th Floor (Part), 5th & 6tth Floor
1,00,000 Sq.Ft. Area
No.30, Museum Road,
Bangalore – 560 001
Hulkul Brigade Centre, Ground Floor, No.82, Lavelle Road, Bangalore 560 001. AUGUST’ 2016
TO
NOVEMBER’ 2016
425.00