Name & Address of Client | Worksite Address | Architects | Consultants | Project Managers | Type of Installation | Period of Execution | Value of Work in LAKHS (INR) |
---|---|---|---|---|---|---|---|
CESSNA GARDEN DEVELOPERS (P) LTD. |
CESSNA BUSINESS PARK | RSP DESIGN CONSULTANTS (I) PVT.LTD. | RSP DESIGN CONSULTANTS (I) PVT.LTD. | — | Supply, Installation, Testing and Commissioning of 66/11KV comprising: • 66/11KV, 19/31.5MVA ‘Kirloskar’ Make Power Transformers with OLTC, RTCC Panel – 2 Nos • 66kV 1250A, 40KA SF6 Circuit Breaker – 2 Nos • 66kV 1250A, 31.5KA Isolator – 13 Sets • 66kV Current Transformers of various Ratings – 21 Nos • 66kV / ?3/110/?3 Voltage Transformers 3 Nos • 66kV Line Protection Control & Relay Panel – 5 Nos • 66/11kV Transformer Protection Control & Relay Panel – 2 Nos • 11kV, 31.5KA, 15-Panel Metal Clad Outdoor VCB Switchboard – 1Set • 11kV Twin Feeder Control & Relay Panel 6 Nos • 11kV Bus Coupler Control & Relay Panel -1 No. • 250kVA, 11kV/433V Station Auxiliary Transformer – 1 No. • LTAC Panel – 1 No. • ACDB – 2 Nos, DCDB – 1 No. • 2x220V, 425Ah Station Battery & Battery Charger – 1 Set • Nitrogen Injection Fire Extinguishing System for above Power Transformers – 2 Nos • 60kV Class-II Surge Arrestors – 15 Nos • 60kV Class-III Surge Arrestors – 6 Nos • GI Station Structures and Equipment Mounting Structures – 1Lot • Safety Accessories etc. as per KPTCL Standards. • 20KVA Power sanction from KPTCL/BESCOM on 11KV Metering. |
||
The Falcon House, # 1, Main Guard Cross Road, Bangalore – 560 001 | 66/11kV Substation at Kadubeesanahalli, Outer Ring Road, Bangalore | RSP House, # 30, Museum Road, Bangalore – 560 001 | RSP House, # 30, Museum Road, Bangalore – 560 001 | (a) | JANUARY ‘2013 TO MAY’ 2014 |
1150.00 | |
• 11kV, 1C x 1000Sq.mm Aluminium Armoured Cable – 1000 Mtr. • 11kV, 3C x 95 Sq.mm Aluminium Armoured Cable – 110 Mtr. • 4C x 70 Sq.mm Aluminium Armoured LT Cable – 70 Mtr. • 4C x 10 Sq.mm Aluminium Armoured LT Cable – 200 Mtr. • 4C x 25 Sq.mm Aluminium Armoured LT Cable – 65 Mtr. • 4C x 70 Sq.mm Aluminium Armoured LT Cable – 310 Mtr. • 2C x 6 Sq.mm Armoured Copper Control Cable – 750 Mtr. • 3C x 4 Sq.mm Armoured Copper Control Cable – 1800 Mtr. • 4C x 6 Sq.mm Armoured Copper Control Cable – 10400 Mtr. • 4C x 10 Sq.mm Armoured Copper Control Cable – 365 Mtr • 10C x 2.5 Sq.mm Armoured Copper Control Cable – 3700 Mtr. • 4C x 2.5 Sq.mm Armoured Copper Control Cable – 2400 Mtr. • 19C x 2.5 Sq.mm Armoured Copper Control Cable – 3700 Mtr. • 4C x 1 Sq.mm Copper Shielded Cable – 520 Mtr. • 1C x 16 Sq.mm Copper Flexible Cable – 100 mtr • 1C x 95 Sq.mm Copper Flexible Cable – 70 mtr. • 1C x 150 Sq.mm Copper Flexible Cable – 500 mtr. • Furniture for Control Room Staff and Maintenance Staff – LS • Earthing – LS DATE OF COMMISSIONING: 30/05/2014 |
|||||||
(b) | Supply and Installation of 66KV Cabling Works for 66/11KV Substation at Cessna Business Park, Kadubeesanahalli, Bangalore – which comprising • 1C x 1000 Sq.mm 66kV, EHV XLPE Insulated, Segmental, Compact type Milliken Copper Conductor, Copper Wire screened, Lead Alloy Sheathed and overall HDPE Sheathed graphite coated Under Ground Cable – 9600 Meters [3.2 Route K.M] • 1C x 630 Sq.mm 66kV, EHV XLPE Insulated, Segmental, Compact type Milliken Copper Conductor, Copper Wire screened, Lead Alooy Sheathed and overall HDPE Sheathed graphite coated Under Ground Cable – 750 Meters [0.25 Route K.M] 66kV Straight through Joint Kit suitable for above 66kV Copper EHV Cables • 1C x 1000 Sq.mm – 18 Sets • 1C x 630 Sq.mm – 3 Sets 66kV Outdoor End Joint Kit suitable for above 66kV EHV Cable • 1C x 1000 Sq.mm – 12 Nos • 1C x 630 Sq.mm – 9 Nos • 6.0kV Class-II Surge Arrestor with G.I. Mounting Structures -6 Nos • 6.6/3.8kV, 1C x 240 Sq.mm Sheath Bonding Cable – 550 Mtrs • 12-Fibre Mono mode, Optic Fibre Cable along with all accessories – 3800 Mtrs • Joint Bays for above Straight through Joints – 7 Nos • All related Civil Works like RCC Cable Trenches, Foundation for Mounting Structures, Terminal Bay Civil Works, Pipes & Sleeves as required. DATE OF COMMISSIONING: 29/05/2014 |
||||||
MAY’ 2013 TO MAY’ 2014 |
1275.00 |