LARSEN & TOUBRO LTD. WIPRO LTD. VENKATARAMANAN ASSOCIATES SRIPEKSHA ENGG. CONSULTANCY SERVICES PVT. LTD,, TATA CONSULTING ENGINEERS LTD., Base Building, HT & LT and Interior Fit-out Electrical Works & 11kV EB Works comprising LT Panels, 11kV HT Panel, 11kV HT Cable / LT Cable & End Terminations, HT Metering Cubicle, 4x2500kVA, 3x3150kVA, 2x1600kVA Transformers, Tap Off Units, 5000A / 4000A / 1600A / 1250A Busduct, Submains / Point wiring, MCB DBs, Cable Trays, Raceways, Junction Boxes, Light & Fax Fixtures, Lightning Protection System, Earthing
P.B.No.979,  Mount Poonamalle Road,
Chennai-600 089
IT-SEZ, Sy.No.98, 99, 91/1, Kodathi Village, Sarjapura Road, Bangalore 10/2, ‘O’ Shaugnessy Road, Langford Gardens,
Bangalore-560025
No.204 (880), Ramaleela Mansion, 2nd Maiin, 4th Block, Rajajinagar, Bangalore-560 010 Bangalore SEPTEMBER’ 2020
TO
NOVEMBER 2021
(BLOCk-2)
HIGH SIDE WORKS
70% 931.00
Block B1 – Office Block
3 Levels of Basement, Ground Floor & 1st Floor to 14th Floor & Terrace Area
8,50,000 Sq.Ft. Area (Internal)
Block B2 – Office Block
3 Levels of Basement, Ground Floor & 1st Floor to 14th Floor & Terrace Area
8,50,000 Sq.Ft. Area (Internal)
Block B3 – Office Block
3 Levels of Basement, Ground Floor & 1st Floor to 13th Floor &
Podium (G.F, 1st to 3rd Floor)
8,50,000 Sq.Ft. Area (Internal)
Block B4 – Office Block
3 Levels of Basement, Ground Floor & 1st Floor to 13th Floor &
Podium (G.F, 1st to 3rd Floor)
(Interior works-May 18 completion)
9,00,000 Sq.Ft.Area (Internal)
Block B5 – Data Center
Ground Floor to 2nd Floor (260 Racks in 1st Floor), 3.2MW
25,000 Sq.Ft. Area
46,25,00,000 Sq.Ft. Area (Apprx.)
Base Building & Utility Area of.
B1, B3, B4, B5 Sq.Ft. Area
20,00,000 Sq.Ft.
Leed – Platinum
JANUARY’ 2019
TO
NOVEMBER 2021
(BLOCK-1&3,
INTERNAL WORKS)
90% 4160.00
JANUARY’ 2019  TO
NOVEMBER’ 2021
[EXTERNAL WORKS)
90% 193.00
TOTAL ON HAND 5284.00
BASE BUILDING & HIGH SIDE WORKS FOR
BLOCK-1, 3, 4, 5

INTERNAL WORKS FOR

BLOCK-4
1ST FLOOR TO
10TH FLOOR

BLOCK-5 DATA
CENTER:
G.F, 1ST TO 2ND FLOOR
JUNE’ 2017
TO
DECEMBER’ 2018

100% 4950.00

1050.00

150.00

6150.00

 

Name & Address of Client Worksite Address Architects Consultants Project Managers Type of Installation Period of Execution
LARSEN & TOUBRO LTD., TECH MAHINDRA LTD., LARSEN & TOUBRO LTD., LARSEN & TOUBRO LTD., LARSEN & TOUBRO LTD., Internal Electrical Works for ITC 3 Blocks – 6, 7 & 8  and External Lighting – comprising LT Panels (Installation), Distribution Boards, LT Cables and End Terminations, Light Fixtures, Circuit Main / Conduits / Point Wiring, Cable Trays, Lightning Protection, Raceways, Junction Boxes, Earthing etc.
Installation of HT Electrical Works, 66/11kV Power Transformer, 11kV HT Panels, 11kV Feeder, 11kV HT Cables & End Terminations, 11kV Air Insulated Busducts & Straight Joint (supply)
L&T Construction, Buillding & Factories, Mount Poonamallee Road, Manapakkam, P.B.No.979, Chennai-600 089. TMEC Campus, Electronic City, Phase-2, Bangalore
3 Blocks-ITC-6, 7 & 8
ITC-6 Block: 3Basement + Ground + 10 Floors
ITC-7 Block: 4Basement + Ground + 10 Floors
ITC-8 Block: 4Basement + Ground Floors
14,00,000 Sq.Ft. Area
Chennai Chennai Chennai NOVEMBER’ 2014
TO
DECEMBER’ 2016