LARSEN & TOUBRO LTD. | WIPRO LTD. | VENKATARAMANAN ASSOCIATES | SRIPEKSHA ENGG. CONSULTANCY SERVICES PVT. LTD,, | TATA CONSULTING ENGINEERS LTD., | Base Building, HT & LT and Interior Fit-out Electrical Works & 11kV EB Works comprising LT Panels, 11kV HT Panel, 11kV HT Cable / LT Cable & End Terminations, HT Metering Cubicle, 4x2500kVA, 3x3150kVA, 2x1600kVA Transformers, Tap Off Units, 5000A / 4000A / 1600A / 1250A Busduct, Submains / Point wiring, MCB DBs, Cable Trays, Raceways, Junction Boxes, Light & Fax Fixtures, Lightning Protection System, Earthing | |||
P.B.No.979, Mount Poonamalle Road, Chennai-600 089 |
IT-SEZ, Sy.No.98, 99, 91/1, Kodathi Village, Sarjapura Road, Bangalore | 10/2, ‘O’ Shaugnessy Road, Langford Gardens, Bangalore-560025 |
No.204 (880), Ramaleela Mansion, 2nd Maiin, 4th Block, Rajajinagar, Bangalore-560 010 | Bangalore | SEPTEMBER’ 2020 TO NOVEMBER 2021 (BLOCk-2) HIGH SIDE WORKS |
70% | 931.00 | |
Block B1 – Office Block 3 Levels of Basement, Ground Floor & 1st Floor to 14th Floor & Terrace Area 8,50,000 Sq.Ft. Area (Internal) Block B2 – Office Block 3 Levels of Basement, Ground Floor & 1st Floor to 14th Floor & Terrace Area 8,50,000 Sq.Ft. Area (Internal) Block B3 – Office Block 3 Levels of Basement, Ground Floor & 1st Floor to 13th Floor & Podium (G.F, 1st to 3rd Floor) 8,50,000 Sq.Ft. Area (Internal) Block B4 – Office Block 3 Levels of Basement, Ground Floor & 1st Floor to 13th Floor & Podium (G.F, 1st to 3rd Floor) (Interior works-May 18 completion) 9,00,000 Sq.Ft.Area (Internal) Block B5 – Data Center Ground Floor to 2nd Floor (260 Racks in 1st Floor), 3.2MW 25,000 Sq.Ft. Area 46,25,00,000 Sq.Ft. Area (Apprx.) Base Building & Utility Area of. B1, B3, B4, B5 Sq.Ft. Area 20,00,000 Sq.Ft. Leed – Platinum |
JANUARY’ 2019 TO NOVEMBER 2021 (BLOCK-1&3, INTERNAL WORKS) |
90% | 4160.00 | |||||
JANUARY’ 2019 TO NOVEMBER’ 2021 [EXTERNAL WORKS) |
90% | 193.00 | ||||||
TOTAL ON HAND | 5284.00 | |||||||
BASE BUILDING & HIGH SIDE WORKS FOR BLOCK-1, 3, 4, 5 INTERNAL WORKS FOR BLOCK-4 BLOCK-5 DATA |
100% | 4950.00
1050.00 150.00 |
||||||
6150.00 |
Name & Address of Client | Worksite Address | Architects | Consultants | Project Managers | Type of Installation | Period of Execution |
---|---|---|---|---|---|---|
LARSEN & TOUBRO LTD., | TECH MAHINDRA LTD., | LARSEN & TOUBRO LTD., | LARSEN & TOUBRO LTD., | LARSEN & TOUBRO LTD., | Internal Electrical Works for ITC 3 Blocks – 6, 7 & 8 and External Lighting – comprising LT Panels (Installation), Distribution Boards, LT Cables and End Terminations, Light Fixtures, Circuit Main / Conduits / Point Wiring, Cable Trays, Lightning Protection, Raceways, Junction Boxes, Earthing etc. Installation of HT Electrical Works, 66/11kV Power Transformer, 11kV HT Panels, 11kV Feeder, 11kV HT Cables & End Terminations, 11kV Air Insulated Busducts & Straight Joint (supply) |
|
L&T Construction, Buillding & Factories, Mount Poonamallee Road, Manapakkam, P.B.No.979, Chennai-600 089. | TMEC Campus, Electronic City, Phase-2, Bangalore 3 Blocks-ITC-6, 7 & 8 ITC-6 Block: 3Basement + Ground + 10 Floors ITC-7 Block: 4Basement + Ground + 10 Floors ITC-8 Block: 4Basement + Ground Floors 14,00,000 Sq.Ft. Area |
Chennai | Chennai | Chennai | NOVEMBER’ 2014 TO DECEMBER’ 2016 |
|