Name & Address of Client | Worksite Address | Architects | Consultants | Project Managers | Type of Installation | Period of Execution |
---|---|---|---|---|---|---|
ARMY WELFARE HOUSING ORGANISATION | – | – | – | Establishment of 1 X 16/20 MVA, 66KV/11KV Sub Station for arranging power to an extent of 10875 KVA at Army Welfare Housing Organisation at Kannamangala Village, Bidarahalli Hobli, Bangalore and Construction of proposed 66KV LILO Line for a route length of 0.202KM from Hoody – Kadugodi – Hoskote SC Line to the proposed 66/11KV Army Welfare Housing Organization Substation – comprising Supply, Installation, Testing and Commissioning of 66/11KV 16/20MVA Power Transformer with OLTC, RTCC Panel – 1 No. SF6 Gas Circuit Breaker-3 Sets, 66KV, 1250A, 31.5KA Class Double Break, Manually Operated Isolator-6 Sets and 11KV, 25KA-6 Sets, Current Transformers -10 Nos, 66KV Voltage | ||
66/11kV Substation at Kannamangala Village, Bidarahalli Hobli, Bangalore East Taluk | NOVEMBER’ 2012 TO MARCH’ 2014 |
513.00 | ||||
Transformer-3 Nos, Lightning Arrestor, LT Cables, 110V, 100Ah Station Battery & Battery Charger, Rigid Bus System for connection between equipments using 63mm & 50mm Aluminium Tubes and connectors, galvanised equipments mounting structures, Earth Mat for the entire 66KV Station, ACDB, DCDB, 11KV XLPE cable, 1000Sq. mm. Aluminium cable 2 Runs of 1C x 1000 Sq. mm cable – 69KMs, 1.1 KV Copper Control Cables – 6KMs, Station Auxiliary Transformer, Nitrogen Injection Fire Fighting System, Safety accessories etc including Civil Works, Liaisoning with KPTCL & Chief Electrical Inspectorate approval
DATE OF COMMISSIONING: |